In medtech, regulation sets the calendar and proof has to be clinical. The first reference usually comes from a collaboration with a hospital team. I have not sold a medical device myself. My closest experience is Parcoor, in cybersecurity for device manufacturers, so read this as my sales method applied to the hospital setting, and take regulatory advice for your device.
What regulation changes
Under the Medical Device Regulation (EU) 2017/745, you cannot place a device on the market without CE marking, and for everything except basic class I devices that involves a notified body. Clinical evidence is required, and a clinical investigation needs ethics review and the competent authority's authorisation or notification, depending on the device.
Three consequences for your sales plan:
- Classify early. Rule 11 places much diagnostic software above the lowest class, which changes both your timetable and your budget.
- Contact notified bodies early. Do not assume a date until one has given you a slot.
- Sell before you can invoice. Use the period before CE marking to line up research partners and letters of intent.
Later entrants will face the same work, which gives you some protection. The regulation guide covers how to use the MDR transition.
Who decides in a hospital
| Profile | Role in the decision |
|---|---|
| Clinician | Judges clinical relevance. Often your best champion |
| Biomedical engineer | Assesses technical fit, recommends and rarely buys |
| Hospital pharmacy | Checks conformity and traceability, in countries where it handles devices |
| IT and security | Checks integration and data handling |
| Management and procurement | Weighs cost, patient impact, reimbursement and risk |
A good champion has a concrete problem, influence in the hospital and time to give. Equip that person with an argument for each profile, as in the long-cycle guide.
Getting the first reference
Everyone asks who already uses the device, and at the start the honest answer is nobody. Propose working together, and a hospital can then say yes without being your first customer:
- A research collaboration with a clinical department, leading to a joint publication.
- A controlled pilot on one department or protocol, with measurable criteria.
- Co-development with a clinician whose expertise shapes the product.
I would expect private hospital groups to have shorter routes to a decision. University hospitals tend to take longer, and their name carries weight with the rest of the market. A third party can also block you, so ask early who has to approve the test, and put the answer in the POC contract.
Building proof in layers
- Technical: a deployment in real hospital conditions, with old equipment and strict networks.
- Clinical: a validation study showing a benefit for patients or care teams. Prefer concrete measures to abstract percentages, such as time saved per shift.
- Economic: the effect on cost per patient, length of stay or repeat tests. Finance teams and reimbursement bodies ask for this.
What stays national
The CE mark covers the EU market, while reimbursement, hospital funding and purchasing structures differ by country. Treat each one as a separate market entry, and start where you already have clinical contacts. If you also sell in the UK, check the rules of the MHRA, the UK regulator, separately.
Frequently asked questions
Do you need CE marking before talking to hospitals?
No. You can talk to hospitals, and run a clinical investigation under its own rules, before CE marking. You need the mark before you place the device on the EU market, so aim to have partners committed by then.
How do you sell a medical device with no reference?
Offer a collaboration: a validation study with a clinical department, a pilot in a controlled setting, or co-development with a clinician. The clinician gains a publication or a better tool, and you gain proof.
Who decides in a hospital?
Several people, and it varies by country and type of hospital. Expect clinicians, biomedical engineers, pharmacy, IT and security, procurement and senior management, with regional or group purchasing in some systems.