Sector guide

Selling Industry 4.0 to factories that already run

A profitable plant has no visible reason to change. The sale starts by putting a figure on losses everyone has come to accept.

Abraham Brakha||4 min read

To sell to a factory, cost a problem the site has learned to live with, find someone on the shop floor who wants it solved, and prove the value on one line. None of my detailed case studies is in manufacturing, so read this as my method applied to the sector.

The factory already works

Orders ship and the teams know their machines. Unplanned stoppages and scrap exist, and they are seen as part of the job. Equipment is often old, with no sensors or network connection, so each plant is a special case. As long as nobody has put a figure on the losses, there is no budget.

Cost the problem together

The cost of a stoppage varies widely by sector and site, so do not bring a generic number. The data is usually in the plant, and it has rarely been added up over a year. Do that sum with the plant manager. "How many stoppages last month, and what does one cost you?" is a better start than an accuracy score. Your price can then rest on that figure.

The people

The champion is usually a technical director or a maintenance manager who lives with the emergencies. Keep field staff in mind too: a technician who knows a machine by its sound may see your dashboard as a threat to that expertise. Present the tool as help with anticipating problems, and involve that person from the start.

OT and IT integration

The shop floor runs on industrial controllers and old protocols, while IT runs on cloud and modern APIs. The two teams share neither vocabulary nor constraints. Even with a convinced plant manager, integration can take months, and it is the main technical risk. Explain it to non-technical decision-makers in terms of risk and timetable. Non-intrusive sensors and retrofits can reduce it.

The pilot

  1. Pick a line with a measurable problem.
  2. Record a baseline before you change anything.
  3. Run the solution for an agreed period.
  4. Report the result in the value of production saved.
  5. Package the result so that the next site can decide without starting again.

Respect the industrial calendar. Planned shutdowns and the budget round decide when you can install and when money is released, and missing them can delay you until the next window. One successful line can then open other sites, which is land and expand. From POC to contract covers the conversion.

Integrators: partners and competitors

Large integrators and automation vendors have the access you lack, and they may also build something similar or recommend someone else. Position your product as a component that complements them, and make the arrangement worth their while. Learn to sell it yourself first, so that you can teach a partner how.


Frequently asked questions

How do you convince a plant manager to adopt Industry 4.0?

Talk about production saved, in their numbers. Stoppages and scrap are often treated as normal until someone adds them up, so do that calculation together.

Who is the champion in a factory?

Often a technical director back from a trade show, or a maintenance manager tired of weekend emergencies. Announcements about digital transformation from the top carry less weight than someone who lives the problem.

How do you prove the return?

Choose a line with a measurable problem, record a baseline, run your solution for an agreed period, then express the difference in the value of production saved.